Budgets
Cost control begins with an accurate estimate. When design information is limited, the art of conceptual estimating is critical to achieve accuracy. The conceptual estimate should be as detailed as the final estimate. Undefined aspects have to be listed as allowances and quantified realistically. As the design progresses, allowances will be quantified and turned into detail cost line items. The best time to avoid cost on a project is in the planning stages.